150 Tonne Pipe Tensioner
The 150 Tonne Pipe Tensioner was built as part of a larger Flexible Deployment System, developed for Aker Solutions and completed in April 2010.It will be shipped to the Gulf of Mexico for final installation onto the construction vessel Boa Sub C.